- 2012-3-2 New Exterior Lamps
- 2012-3-2 New Crown Moulding
- 2012-3-2 Sanding the beadboard walls
- 2012-2 Insulation
- 2012-2-29 Depot In Winter
- 2012-2-25 R Taylor finishing the flooring and door sill
- 2012-2-25 Installing the new beadboard ceilings
- 2012-2-25 Brand new floors from R Taylor
- 2012-2-18 Interior Beadboard and Windows Installed
- 2012 Bird Houses for Sale
- 2012-2-18 Volunteers
- 2012-2-15 Sanding the new floors
- 2012-2-15 Chimney Vent
- 2012-2-15 Laura sanding and scrapping the old mouldings
- 2012-2-14 Freshly insulated walls.
- 2012-2-14 Insulating the Depot
- 2012-2 Insulation Contractors Arrive
- 2012-12 New exterior lamps installed
- IMG 5102
- 011512 We have acquired a box of recycled hardware for the depot.
- 2011-12 18" of Ceiling Insulation
- IMG 4877
- 2011-11 R Taylor receives donation from EF Historical Society
- IMG 4857
- 2011-12 Preparing the ceiling insulation
- IMG 4850
- IMG 4849
- IMG 4847
- 2011-2-25 Rail Trail Restroom Welcome Addition
- 2011-9 Installing Vapor Barrier and Ceiling Beadboard