- 2012-1-11 Vapor barrier under the reception center floor
- 2011-1-18 Laura does a cleaning job on the stove.
- 2011-2-2 New basement steps.
- 2011-9 New beadboard for the inside walls.
- 2012-3-3 A pot of chili tastes good on a cold day.
- 2012-3-13 Mike is rebuilding the ticket window.
- 2012-4-3A new security system has been installed.
- 2012-9 A hatch in the ceiling for access to the attic insulation work.
- 2011-9 Our construction boss, Rich Taylor is honored by the Eleanor Roosevelt group at Val-Kill
- 2012-9-12 A New dutch door on the agents office
- 2012-8-12 Mike and Joe hang an interior door.
- 2012-3-12 The visitor center now has white walls and a sky blue ceiling
- 1998 Preservation Interior
- 2004 Floor Joists
- 2004 New Cinder Block Wall
- 2005 Scaffolding for West End Joists
- 2006 New Bay Window Interior
- 2011 Irene water in the depot basement
- 2011 New Window Installed
- 2011 Repairing a Door
- 2011-2-11 Visitor center floor boards sorted by width.
- 2012-4-13 Display cases for the reception center.
- 2012-5 Installing New Display Panels
- 2012 Joe Charlie Mike Repairing Frame
- 2012-4-14 New Benches
- 2012-4-14 Ticket Window Trim
- 2013 Cleaning Brushing Potbelly Stove
- 2011-3-27 Visitor center crown molding in place.
- 2011-9 The arch-top door gets a lot of detailed attention.
- 2011-9 Rich Taylor at work