2012-1-11 Vapor barrier under the reception center floor
2011-1-18 Laura does a cleaning job on the stove.
2011-2-2 New basement steps.
2011-9 New beadboard for the inside walls.
2012-3-3 A pot of chili tastes good on a cold day.
2012-3-13 Mike is rebuilding the ticket window.
2012-4-3A new security system has been installed.
2012-9 A hatch in the ceiling for access to the attic insulation work.
2011-9 Our construction boss, Rich Taylor is honored by the Eleanor Roosevelt group at Val-Kill
2012-9-12 A New dutch door on the agents office
2012-8-12 Mike and Joe hang an interior door.
2012-3-12 The visitor center now has white walls and a sky blue ceiling
1998 Preservation Interior
2004 Floor Joists
2004 New Cinder Block Wall
2005 Scaffolding for West End Joists
2006 New Bay Window Interior
2011 Irene water in the depot basement
2011 New Window Installed
2011 Repairing a Door
2011-2-11 Visitor center floor boards sorted by width.
2012-4-13 Display cases for the reception center.
2012-5 Installing New Display Panels
2012 Joe Charlie Mike Repairing Frame
2012-4-14 New Benches
2012-4-14 Ticket Window Trim
2013 Cleaning Brushing Potbelly Stove
2011-3-27 Visitor center crown molding in place.
2011-9 The arch-top door gets a lot of detailed attention.
2011-9 Rich Taylor at work