Choose filters
Cancel
Validate
Choose filters
Validate
Creation date
Previous
Validate
Validate
Search tips
Validate

2012-9-12 A New dutch door on the agents office
2012-3-12 The visitor center now has white walls and a sky blue ceiling
2012-9 A hatch in the ceiling for access to the attic insulation work.
2011-9 Our construction boss, Rich Taylor is honored by the Eleanor Roosevelt group at Val-Kill
2012-4-3A new security system has been installed.
2012-3-3 A pot of chili tastes good on a cold day.
2012-3-13 Mike is rebuilding the ticket window.
2011-9 New beadboard for the inside walls.
2011-3-27 Visitor center crown molding in place.
2011-2-2 New basement steps.
2011-2-11 Visitor center floor boards sorted by width.
2011-1-18 Laura does a cleaning job on the stove.
2012-8-12 Mike and Joe hang an interior door.
2012-1-11 Vapor barrier under the reception center floor
2012-4-14 Ticket Window Trim
2013 Cleaning Brushing Potbelly Stove
2012-4-14 New Benches
2012-4-13 Display cases for the reception center.
2012-5 Installing New Display Panels
2011-9c New Side Walk
2011-6-12 Yellow Paint Numbers
2011-9b Pouring New Side Walk
2011-3-15 Weather Sealing Bay Window
2011-6-11 Western Union Sign Installed
2011-3-5 Recycling Scrap Metal
2011-4-11 Repairing West Door
2011-9 Rail Trail Kiosk
2011-9 Rail Trail Parking Lot
2011-9 Rail Trail Construction
2011-5-10 Rail Trail Construction