- 2012-4-14 New Benches
- 2012-4-14 Ticket Window Trim
- 2011-9 The arch-top door gets a lot of detailed attention.
The arch-top door gets a lot of detailed attention. - 2011-9 New Beadboard Ceiling
- 2012-2-25 Brand new floors from R Taylor
- 2012-2-25 Installing the new beadboard ceilings
- 2011-9 Painted Arch Door
- 2011-9 Painting Exterior of Square Top Door
- IMG 4847
- 2011-9 Framing Roof Hatch
- 2011-9 Installing Ceiling Joists
- 2011-9 Installing Bead Board Celinng Panels
- IMG 4849
- 2012-4-13 Display cases for the reception center.
- IMG 4877
- 2012-3-13 Stove from Fishkill Station
- 2011-12 Preparing the ceiling insulation
- 2011-9 Rich Taylor at work
- 2012-3-30 Hanging American Flag
- 2011-12 18" of Ceiling Insulation
- 2012-3-2 Sanding the beadboard walls
- IMG 4857
- 2012-2-14 Freshly insulated walls.
The new Depot will be a lot warmer than the original - 2012-2-14 Insulating the Depot
- 2012-2-25 R Taylor finishing the flooring and door sill
- 2012-3-27 New Crown Mouldings
- 2012-2-15 Sanding the new floors
- 2012-3-2 New Crown Moulding
- 2012-2 Insulation Contractors Arrive
- 2012-12 New exterior lamps installed