« 2010
2012 »
January
February
March
April
May
June
July
August
September
October
November
December
All
- 2011-12 18" of Ceiling Insulation
- IMG 4877
- 2011-11 R Taylor receives donation from EF Historical Society
- IMG 4857
- 2011-12 Preparing the ceiling insulation
- IMG 4850
- IMG 4849
- IMG 4847
- 2011-2-25 Rail Trail Restroom Welcome Addition
- 2011-9 Installing Vapor Barrier and Ceiling Beadboard
- 2011-2-21 Team is Preparing Boards and Battens for the Exterior
- 2011-9 Framing Roof Hatch
- 2011-9 Painted Arch Door
- 2011-9 Basement Workshop Bench
- 2011-9 New Beadboard Ceiling
- 2011-9 Installing Ceiling Joists
- 2011-9 Repairing the square top door
- 2011-9 Rich Taylor at work
- 2011-9 The arch-top door gets a lot of detailed attention.
The arch-top door gets a lot of detailed attention. - 2011-9 Installing Bead Board Celinng Panels
- 2011-9 Painting the mileage numbers
- 2011-9 Painting Exterior of Square Top Door
- 2011-11 Exterior
- 2011-9 Installing Ceiling Vapor Barrier
- 2011-9d Saw Cutting the New Walk
- 2011-Q Installing Shingles
- 2011-S New Chimney waiting for flashing
- 2011-O Faux Slate Roof Shingles Arrive
- 2011-N Shingles Arrive
- 2011-S Early Winter Snow